Bulgaria’s Sofia Airport closes for all landing flights overnight, unable to cope with snowy winter conditions
Bulgaria’s Vassil Levski Sofia Airport closed for all landing flights from 9am on November 29 until an unspecified time on the morning of November 30, as ground operators were unable to handle all flights due to the severe winter weather conditions, according to statements by the airport.
As Bulgaria was hit by heavy snowfalls, dozens of flights at the airport were delayed.
Media reports showed passengers complaining after being left for long hours aboard aircraft on the ground and complaining about a lack of information.
More than 100 Bulgarian tourists, tour operators and travel agents missed their cruise on MSC Cruises’s newest vessels after spending more than five hours on board a flight from Sofia to Paris that never took off.
Bulgaria Air flights to Paris, Lufthansa flights to Munich, Bari and other destinations were cancelled.
On the morning of November 29, the airport’s press centre announced slight deviations in the flight schedule , with the delays at that time being between 15 and 30 minutes and no flights being cancelled. The reason was the heavy snowfall and strong winds, which formed snow drifts and made it difficult to clean the airport infrastructure.
Five flights from Sofia were cancelled on Sunday, when heavy snowfall caused delays of five to eight hours for many departing aircraft.
According to the airport operator Sof Connect, the reason was that it turned out that most of the machines that treat the planes against icing were not actually working, although the plans of the external ground operators were “perfect on paper”. This was said to bTV on the evening of November 29 by the executive director of the concession-holder, Jesus Caballero.
Because of the problems, Transport Minister Georgi Peev has ordered the Civil Aviation Administration Directorate General to inspect both Sof Connect and the three ground operators – Swissport Bulgaria, Goldair Handling and Aviapartner Bulgaria, which are responsible for loading luggage and spraying the planes with a liquid that removes the ice that has formed.
Caballero said that the airport operator is responsible for clearing the runways of snow and this is done all the time. However, it turned out that not all 15 de-icing machines available to the three operators were working.
“On paper everything was perfect, but it turned out that some of the machines were not working,” he said.
In addition, due to the 40 centimetres of snow, removing ice from aircraft at the two anti-icing sites took twice as long, Caballero said.
He said that the airport operator has no contractual relationship with the ground handling operators and only the civil aviation directorate can sanction them.
“We have no leverage to make them react and fine them,” he said.
Caballero said that measures have been taken to ensure that there are no problems with the anti-icing machines on Monday, but he admitted that the coming week will be challenging with very low temperatures – especially in the mornings, when an average of 14 flights take off and have to be prepared against icing.
